List Of Job Experience
2021
Piping Work – Storage TDI & POP Tank Extension Work – PT. Serim Indonesia Project
PT. Serim Indonesia, Cikande – Serang , Banten
Refractory Shop Application for CO Boiler Bypass Stack RDMP RU V – Balikpapan Project
PT. HANAZONO ENGINEERING INDONESIA, Bojonegara – Serang , Banten
2020
Piping Work – Storage TDI & POP Tank Extension Work – PT. Serim Indonesia Project
PT. Serim Indonesia, Cikande – Serang , Banten
Refractory Shop Application for CO Boiler Bypass Stack RDMP RU V – Balikpapan Project
PT. HANAZONO ENGINEERING INDONESIA, Bojonegara – Serang , Banten
2019
Mechanical Work – Installation of Device of ASC Coal Crushing & Conveying System
PT. Asahimas Chemical – Anyer – Banten
Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)
Shut Down Maintenance Work Project
PT. STANDARD TOYO POLYMER, Cilegon, Banten, Indonesia
2018
Refractory Lining for Channel 4A-102-C
PT. Daekyung Indah Heavy Industry – Cilegon – Banten
Refractory Lining for Channel EA-304
PT. Daekyung Indah Heavy Industry – Cilegon – Banten
Replacement Top Shell R-051 at PT. SAU
PT. Daekyung Indah Heavy Industry, – Pengoreng – Banten
Steel Structure KALSEL-1 Coal Fired Power Plant Project
PT. Hans Jaya Utama, – Tabalong – Kalimantan Selatan
Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)
Repair Insulation Main Steam Project
PT. CIKARANG LISTRINDO, Bekasi
Expander Perlite Filling Pupuk Kaltim Project
PT. REKON SARANA UTAMA, Kalimantan
OSBL 300MTD PKO Fractionation Project
PT PARAMITA BANGUN SARANA, Lampung
SRI Project
PT INTI KARYA PERSADA TEHNIK, Cilegon, Banten
Waste Water Line From WWCP Glycerine Tank Project
PT PARAMITA BANGUN SARANA, Marunda
Insulation Tanki KB R.105 Area Tanki Farm KB PH3 Project
PT WILMAR NABATI INDONESIA, Gresik
Replacement Bottom Plate Tank T-207 Project
PT. REDECO PETROLIN UTAMA, Pengoreng Site, Banten, INDONESIA
Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)
Replacement Bottom Plate Tank T-207 Project
PT. REDECO PETROLIN UTAMA, Pengoreng Site, Banten, INDONESIA
2017
Installation of Device of ASC Coal Crushing & Conveying System
Potent Mechanical & Industrial (Xiamen) Co., Ltd
Piping Work M17 – 35 for PT. Dongsuh Indonesia Project
PT. Daekyung Indah Heavy Industry – Cikande – Banten
Mechanical Work for Samheung MDF – 10092 and Installation Project
PT. Samheung Indonesia, Bekasi – Jawa Barat
Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)
OSBL Texturing Piping Line 7 Project
PT WILMAR NABATI INDONESIA, Gresik
Block A GAS Development Project
PT. REKON SARANA UTAMA, Aceh
P4 RM EP Convertion to bag filter Project
PT BARATA INDONESIA, Bogor
200 MTPD CPKO Fractionation Plant#3 Project
PT DOMUS JAYA , Lampung
Insulasi Completion Commissioning Biodiesel 1 Project
PT SEMEN PADANG, Padang
Insulation Piping & Equipment Project
PT JFE SHOJI TRADE INDONESIA, Tangerang – Banten
RBDCNO Line From Small Tank Project
PT PARAMITA BANGUN SARANA, Marunda
Water Ejector Skid Project
PT. APECO KENCANA, Babelan
Emulsifier Texturing Pping Project
PT WILMAR NABATI INDONESIA, Gresik
Tank Farm SF Piping Project
PT WILMAR NABATI INDONESIA, Gresik
Pakugajah Kuang Project
PT ARTHA TEHNIK, Sumatera
Agitator Tank 300KL Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten
Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)
Power Plant ; Erection Limestone & Silica Sand Silo Project
PT. Asahimas Chemical – Anyer, Banten
2016
Piping & Installation Equipment (Filter Press) Project
PT. Hans Jaya Utama, Kawasan Krakatau Industry – Cilegon – Banten
Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)
New Filling Line & New Filling Chiller & Steam Project
PT PARAMITA BANGUN SARANA, Marunda
Demin Tank CAP.180KL Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten
P11 ITP Project
PT INDOCEMENT TUNGGAL PRAKARSA Tbk, Bogor
Tank Farm Biodiesel Project
PT WILMAR NABATI INDONESIA, Gresik
Pusri IIB Project (Additional Work) Project
PT TOYO ENGINEERING COORPORATION, Palembang
Storage Tank Project
PT WAHANA CITRA NABATI , Pulogadung
New Filling Line & New Filling Chiller & Steam Project
PT PARAMITA BANGUN SARANA, Marunda
Demin Tank CAP.180KL Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten
P11 ITP Project
PT INDOCEMENT TUNGGAL PRAKARSA Tbk, Bogor
Tank Farm Biodiesel Project
PT WILMAR NABATI INDONESIA, Gresik
Pusri IIB Project (Additional Work) Project
PT TOYO ENGINEERING COORPORATION, Palembang
Storage Tank Project
PT WAHANA CITRA NABATI , Pulogadung
Chiller Water Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten
Repair Paint HRSG-8 Project
PT. CIKARANG LISTRINDO, Cikarang
TA 1069-C03-PM 03088 Project
PT PARAMITA BANGUN SARANA, Tarjun
Install & Repair FA#1 & 2 Project
PT WILMAR NABATI INDONESIA, Gresik
Semen Rembang Raw Mill Project
PT SEMEN GRESIK, Gresik
BIY Tank 1-2 RepairProject
PT SMART TbK, Marunda
2015
Installation VAC Unit (Blower & Chiller ) Aeon Mall Project
PT. ART Cool – Tangerang BSD – Banten
Installation Mechanical & Structure TPJ-2 Project
PT. Toray Polytech Jakarta – Tangerang – Banten
Refractory Work ( Castable & Firebrick Application )
For LOTTE Engineering & Construction Indonesia ASC Phase VI Project
PT. Asahimas Chemical – Anyer, Cilegon – Banten
Fabrication Of Vessel 13 (Thirteen) Sets & Installation Project
PT. Daekyung Indah Heavy Industry – Cilegon – Banten
Installation Blower Unit 51 (Fifty One) Unit & LPG Tank Aeon Mall Project
GS Neotek Vietnam & Powertech Indonesia – Tangerang BSD – Banten
Installation Work for Alignment Auto Clave at PT. Broco Project
PT. Daekyung Indah Heavy Industry – Cilegon – Banten
Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)
Hot Insulation Work Equip, Pipe & Duct Project
PT INDO BHARAT RAYON, Purwakarta
Blasting & painting Steel Structure Project
PT. MERAK ENERGI INDONESIA, Merak – Banten
Perlite NH3 Tank Project
PT. PUPUK KUJANG, Cikampek
PLTU 2X140 MW Project
PT. APECO KENCANA, Babelan
Indarung VI Cement Plant Project
PT SEMEN PADANG, Padang
Beading Tank Cap,235 MT Project
PT WILMAR NABATI INDONESIA, Gresik
Surabaya Refinery 3 Supply Tracing OSBL Project
PT PARAMITA BANGUN SARANA, Surabaya
Pusri STG & Coal Boiler Project
PT. REKAYASA INDUSTRI, PALEMBANG
Steam Pipe Line GT#2 To Header MPS Project) Project
PT WILMAR NABATI INDONESIA, Gresik
BUFFER TANK 200t Project
PT PARAMITA BANGUN SARANA, Surabaya
Pulau Sambu Fuel Storage Terminal Project
PT. WIJAYA KARYA, Riau – Batam
Lubuk Gaung Refinery Project (D6 1 Unit) Project
PT PARAMITA BANGUN SARANA, Dumai
Boiler Line Piping BKP Project
PT BINA KARYA PRIMA, Marunda
RPO-RPS Pipeline Texturing Line 5 Project
PT WILMAR NABATI INDONESIA, Gresik
STEAM PIPING Project
PT. DAYA CIPTA ANUGRAH, Citeureup
HOT PIPING Project
PT WIRAJAYA PACKINDO, Sadang
HOT PIPING Project
PT WILMAR NABATI INDONESIA, Cilegon – Banten
JETTY A EXTENTION Project
PT WILMAR NABATI INDONESIA, Gresik
Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)
Storage Tank Erection, 6 unit, Cone Roof Type, Sandblasting & Painting Work Project
PT. Asahimas Chemical – Anyer, Banten
Storage Tank Erection, 3 unit, Cone Roof Type, Sandblasting & Painting Work Project
PT. Asahimas Chemical – Anyer, Banten
Storage Tank Erection, 3 unit, Sandblasting & Painting Work Project
PT. Asahimas Chemical – Anyer, Banten
2014
Refractory Work ( Castable & Ceramic Fiber Application )
For LR – 2 Refinery Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
Refractory Work ( Castable & Ceramic Fiber Application )
For JGCS / Nghi Son Refinery & Petrochemical, Vietnam ‘ NSRP’ Project
Furnace Engineering INC. Yokohama, Japan
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
Refractory Work ( Castable & Ceramic Fiber Application )
For ARL UPGRADATION Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
Refractory Work ( Castable & Ceramic Fiber Application )
For PUSRI B2 Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
TAR-2014 General Static Job Package ( Oxidation & PTA )
PT. BP Petrochemicals Indonesia, Tanjung Gerem, Merak – Cilegon , Banten
TAR-2014 SWI Job Package
PT. BP Petrochemicals Indonesia, Tanjung Gerem, Merak – Cilegon , Banten
Installation Blower Unit 30 (Thirty) at AEON Mall Project
PT. Plant Samyoung Indonesia, Tangerang BSD – Banten
Installation Genset Unit 8 (Eighty) at AEON Mall Project
PT. Kointec Engineering, Tangerang BSD – Banten
Mechanical Fabrication Work Project
PT. Daekyung Indah Heavy Industry, Cilegon – Banten
Fire Fighting System Installation Project
PT. Plant Samyoung Indonesia, Tangerang BSD – Banten
Installation Chiller Unit 5 (Five) Unit at Aeon Mall Project
PT. ART Cool, Tangerang BSD – Banten
Piping Work Coke Tar LP Unit Project
PT. Daekyung Plantec, Posco KS – Cilegon – Banten
Installation & Allignment Auto Clave Project
PT. Daekyung Indah Heavy Industry, PT. Broco ACI – Banten
Fabrication & Installation Assembly Project
PT. Chosun Raya Indonesia, Posco KS – Banten
2013
Refractory Work ( Castable & Ceramic Fiber Application )
For Boustead International Heaters Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
Refractory Work ( Castable & Ceramic Fiber Application )
For TAIF – NK VCC LLE2 Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
Refractory Work ( Castable & Ceramic Fiber Application )
For JGC / PETRONAS TRAIN-9 Project
Furnace Engineering INC. Yokohama, Japan
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung
“8” HVGO Piping Work Relocation Work Project
PT. CAZ Konstruksi – Dumai – Riau – Sumatera
Fabrication & Installation Assembly Project
PT. Chosun Raya Indonesia, Posco KS – Banten
2012
Installation Mechanical & Structure TPJ-1 Project
PT. Toray Polytech Jakarta – Tangerang, Banten
Mechanical & Piping Work (Conveying System) Project
PT. CAZ Konstruksi – Dumai – Riau – Sumatera
2011
100 MPTD Sago Starch Factory, Mechanical & Piping Work for 2nd Phase Work
PT. CAZ Konstruksi – Dumai – Riau – Sumatera